Kitchen Renovation – Moving to Open Concept

2014-07-29 by . 19 comments

Post to Twitter

This is part two of a series.

For part one, read Kitchen Renovation – Introduction and Footings.

The previous installment dealt with the building a new footing to support the interior end of the beam. When I last left you, I had posted a picture of wet concrete in a hole. As luck would have it, that wet concrete soon became dry, hard concrete. I watered it a couple of times to help it cure, and waited the prescribed 5 days (warm weather) curing time before loading it. Installing the posts was relatively simple. Cut 2x4s to length, hammer them into the bracket, and bolt them together. Well, it should have been simple. The problem was that 5 2x4s makes a post 7 1/2 inches. I had a stud that I really didn’t want to demolish at about 16 inches on either side. My drill, with a bit long enough to penetrate the post, was just too big to fit in that stud bay. The idea occurred to me that I could use a shorter bit, and by drilling the holes with absolute perfection, have them meet somewhere in the middle. However, that involves more precision than I am capable of; so I nixed that idea right off the bat. I ended up using a short, 3/8 spade bit to start the hole, and when I had gone in a couple of inches, stuck the long bit in the hole, wiggled my drill onto the long bit, and using some severe bodily contortions, managed to tighten the chuck. Then I finished drilling.

Now that the holes were drilled, it should have been a simple matter of slipping the bolts in and tightening the nuts. Not quite. There was a new problem. An 8-inch carriage bolt doesn’t quite make it through 7 1/2 inches of post when the 2x4s aren’t exactly tight together. I grabbed a couple of bar clamps and tried to move everything, but it just didn’t work. Road Trip! Off to the the blue store! At the blue store, I bought a ten inch bolt. I stuck it in, and nutted it tight, and everything came together tightly — tight enough that the next hole now took the 8 inch. Working up, I pulled the post together, and when I was done, took the ten-incher out and replaced it with and 8. I’m sure I could have returned the long bolt, but I had used it, and decided not to.

I installed a bit of blocking at the top, used structural screws to the header, and 10d nails into the bracket at the bottom. Once everything was done, it felt really solid. I’m not a structural engineer, but sometimes you can just tell that something won’t fall down. This won’t. Unfortunately, I was rather neglectful in the camera department, so all I have is a picture of the top of the post.

Top of basement post.

Top of basement post.

Next Step: Prepare for the post at the other end.

This one should have been simpler. I had a lot more room to work, having cleared out a couple feet of plaster on either side. The plan called for a single 8″ bracket, drilled into and epoxied to the top of the foundation wall. I had a sneaking suspicion that the foundation wall might have been hollow block, which would have required me to fill a couple of courses with concrete before mounting the bracket. Luckily, I was wrong. It was a solid poured foundation and it was wide enough for full bearing. Simple! All I need to do is drill and slip in my bracket. What I didn’t consider, and neither did my engineer, was that all those joists had to end up somewhere. In particular, the 2×8 double joist that was supporting the existing wall would probably be resting on the foundation wall right where I wanted to put my post! There was a third joist a couple inches away, and the space between was filled another bit of 2×8. So I opened up my finest drafting tool (MSPaint) and put together a quick sketch to email to the engineer:

Revised plan for exterior wall post.

Revised plan for exterior wall post.

That email was sent off, and my wife and I went out to a friends for 1 pound striploins, many kilos of wine and several of Fidel’s finest exports. The engineer got back the next day and approved my revision. Road Trip! This time, to the orange store, which rents tools. I rented a concrete drill and bought a tube of concrete epoxy. It took about 3 minutes out of a 4 hour rental to drill the hole. I cleaned the hole out with the shop vac, squeezed in the tube of epoxy, and stuck the base in. I quit there, figuring we’d put the post up on beam day. Besides, I had a whole lot more work to do.

Demolition:

Once again we enter the realm of lower skilled labour. My contractor is booked solid over the summer, and can only give me a day here and there for jobs that I really need him for. Swinging a hammer at old plaster walls isn’t a valuable use of his skills. So I did it myself. First, I put 6 mil poly and duct tape over every door in the house. I had learned from the small amount of demolition that I had already done for the front post, that dust gets everywhere. Turns out I needn’t have bothered. Dust got everywhere anyways. I did have the foresight to put big shipping bags over all the furniture that was too big to move out, and laid the 6-mil over the wood floor. Then I spent two days swinging a sledge, prying and reciprocating away the plaster walls. Not fun work, but also not work I want to pay top dollar for. A second person would have been useful to make trips to the dumpster, but I didn’t want my spouse becoming concerned over the mess I was creating. The only point of interest is that plaster is messy, and some genius thought it would be a brilliant idea to put wire mesh on ever corner, both inside and outside, nailed about every 2 inches. I suppose it was meant to last, and it did last for 50 years, but I wanted it to no longer last. I also ran into something the previous owner had done himself. At one point he had installed some off the shelf cabinetry, and added a couple more cabinets than the original builder had. This meant that the bulkheads didn’t quite match up. So he boxed them out with plywood. The only problem was that he was a frugal man. The type of penny-pinching gentleman that saves every screw he has ever removed in a jar. Well, he used those recycled treasures on this project. It took five different screwdrivers to pull them out: two sizes of Phillips, red and green Robertson and a slot. I saved those screws, and will use them to install something just before I sell the house. He actually did a good job of it. Everything was tight and square, and there was no room to squeeze in my reciprocating saw with a metal blade to cut them off.

At some point in there, my brother-in-law and his wife came over to help Anna pack up the cabinetry, and destroy any cabinetry that we could get away without. I also made some trips to the specialty lumber yard to order parts. I needed a couple of big nasty metal brackets to connect the beam to the posts. The load should be bearing down on the posts vertically, but we need something that can handle a bit of torque or the whole house collapses like this: / /. I also needed to order the beam, which was 4 plies of 16 inch by 1 3/4 inch LVL. The parts I needed, while standard in the catalogue, are actually made to order. This meant some delays, but the Simpson Strong Tie plant is only a 15 minute drive from my place, so I saved some time by picking them up rather than waiting for delivery. I also went to the bolt specialty store to pick up big 3/4 inch by 8 inch bolts at 8 bucks a piece.

Also somewhere in there, I spent a day and a half moving electrical circuits away from the wall to be demolished. Unfortunately, the orange store did not have wire stretchers available for rent, so it involved purchasing junction boxes to put in the basement drop ceiling or attic for splicing purposes. Only three orange/blue trips. Managed to snag a 20 m roll of 14/2 off of my next door neighbour who literally just happened to be carrying it out of the house to my bin (with my permission), as she was cleaning up her late husbands workbench. The fun work begins:

Wiht all the prep done, it’s now that most joyous of days! Beam Day! My contractor, Adriano and his buddy Franky showed up, with a truckload of tools, when they said they would, with a cup of Tim Horton’s each. On time and pre-coffeed. These are responsible contractors. They took 15 minutes to look at my plans, look at my parts, and took off to the orange store to buy big honking drill bits. Half an hour later, they were back, ready to work.

The first thing we did was install the post at the front, and mount one of the big ECC brackets. Then more of the same at the other end. IMPORTANT: Everything takes longer than you expect. Cutting, drilling and bolting 5 2x4s together should only take 10 minutes. Wrong. It’s more like 30. Then drill 2 8-inch by 3/4 inch holes for the bracket bolts. About 15 minutes each. Between Adriano’s drill, Franky’s drill and my drill, we managed to not heat them up too much. Adriano did one end, Franky the other, and I ran around and did what I was told without getting in the way. Once the post and brackets were up, it was time to install the beam.

We live in a back split, and are very fortunate (for this job) to have fantastic access to the the attic. Through the wall — not the ceiling. But, even with that, there was no way we were going to be able to manouevre a 23-foot long beam to that access door. Particularly since we only had 20 feet to the back of the house. Adriano went into the kids’ room, and took out a window. Something I never would have had the courage to do. (For fear of breaking the glass or slicing my hand off.) Franky and Adriano fed the beam segments up to the second floor window, while I grabbed and got it into the house to a balance point. Then I could hold it while the guys ran upstairs to feed it in the rest of the way. The first three segments went in easily, the fourth required a bit of “encouragement”. But we squeezed them into the brackets. We now had 4 plies in the brackets — and it was only 10:30. This job would be done by noon! Franky screwed a 2×6 across the joists parallel to the beam so we could use a pry-bar to straighten the beam, and temporarily screw it the the joists to keep it straight. (Important: do this before bolting to the brackets.)

All that was left was to drill 8 3/4 inch holes, 24 1/2 inch holes, bolt everything in, and nail up the joist hangers. That took another 4 hours. Plus a trip to the blue store for more nuts and nails. At 2:30, it was time to test our creation. Franky and Adriano went at the stud wall with sledges and pry-bars and got rid of the of the offending lumber while I ran back and forth to the dumpster. At 3:15, there was a mass rush with brooms, garbage cans and the shop vac, while we fought over the ownership of tools. Actually, sorting out tools was easy. I had designated 3 areas beforehand so that each person had their own storage. Other than a couple of drill and impact bits that we were exchanging freely, everyone respected the zones.

3:45, beer on the back patio, while I counted money out to the boys. They earned every penny. There was no way I could have done this job with a couple of unskilled buddies and a case of beer.

The Money Shot!

Post and Beam connection against exterior wall.

Post and Beam connection against exterior wall.

Post and Beam - Interior

Post and Beam – Interior

Post and Beam Interior

Post and Beam Interior

Joist hangers

Joist hangers

Why we did this

Why we did this

Reverse angle

Reverse angle

Anna was thrilled when she came home. We had finally achieved the open concept that we wanted. Well worth the effort.

The question I know you all have is “Was he properly attired during all this work?” I’ll leave you with this photo, salt stains and all:

WP_20140722_009

Next Up: Flooring, Kitchen and more demo.

profile for Chris Cudmore at Home Improvement Stack Exchange, Q&A for contractors and serious DIYers

Filed under Projects

19 Comments

Subscribe to comments with RSS.

  • Bob Bies says:

    Beautiful. Now, I think I’d love to remodel my kitchen. Aside from fun, it’s good to work your mind on creativity.

  • 3 Inch Painters Tape says:

    That was a great job! I know how kitchen renovations can be tough. Aside from the works, there will also be moving around of furniture. In the process, mess can easily scatter all over the place. I’d love to see the final result of your kitchen renovation. 🙂

  • Rugoland says:

    This is great job. Thank you for very detailed review.

  • Ruby says:

    I’m impressed with the work you’ve done, and would love to see more of your work in the future. I’ve also been trying to incorporate new ideas and now working on different connector designs with the help of metal fabrication company Bayview Metals, ON. Hope the idea clicks.

  • John Wilson says:

    Impressive work well done! Thanks for sharing!

  • Dwight Gropper says:

    Wow! I love this new way of remodeling the kitchen. I’m sure my wife will love the way our kitchen will be designed. Thanks for this post!

  • Anup says:

    i have a very small Kitchen which get suffocated even if i use the exhaust.I use a modular kitchen and quite uneasy with the smoke.Can you please suggest me some good kitchen modification ideas for the best uses?

  • Jessica Ray says:

    @Chriscudmore

    That was a mind boggling work! I know how kitchen redesigns can be great. Close to the works, there will moreover be moving around of furniture. At the same time, confusion can without a doubt diffuse all over the place. I’d adoration to see the last outcome of your kitchen overhaul.

    Regards Jessica Ray

  • Stu Chang says:

    @chriscudmore

    Without further ado, I think I’d adoration to reconstruct my kitchen. Close to fun, it’s extraordinary to work your mind on creative ability. Do I have to know what I need before I begin kitchen redesign?

    Regards Stu Chang

  • Annabel says:

    @chriscudmore

    That was a remarkable occupation! I know how kitchen overhauls can be compelling. Alongside the works, there will similarly be moving around of furniture. At the same time, destruction can without quite a bit of a stretch spread all over. I’d adoration to see the last delayed consequence of your kitchen overhaul

  • Jessica Ray says:

    @chriscudmore

    That was an unprecedented occupation! I know how kitchen updates can be great. Next to the works, there will in like manner be moving around of furniture. At the same time, destruction can without quite a bit of a stretch disperse all over the place. I’d adoration to see the last eventual outcome of your kitchen overhaul

    Regards Jessica Ray

  • I like this new style of renovation the kitchen.I’m sure my family will love this new style kitchen.

  • Interesting article, we used to have a kitchen showroom but moved in a different direction.

  • Abhimanyu says:

    @HomeImprovementBlog

    I’m very impressed with the fine work that you’ve done, i definitely would love to see more of your work in the future. Your blog always gave me great ideas and inspiration. So thanks a lot

    Regards Abhimanyu

  • karan says:

    I like your kitchen this is great Technics thanks for sharing with us

  • AquaFresh says:

    That was an extraordinary occupation! I know how kitchen redesigns can be extraordinary. By the works, there will in like way be moving around of furniture.

  • Malika Ahuja says:

    That was an awesome occupation! I know how kitchen remodels can be extreme. Beside the works, there will likewise be moving around of furniture. Simultaneously, chaos can without much of a stretch disperse everywhere. I’d love to see the last aftereffect of your kitchen redesign. 🙂

  • nayra sheikh says:

    I like your kitchen designs this is make it beautiful thanks for share.

  • Leo says:

    thanks for a lot

  • Comments have been closed for this post